Skip to content

data: refresh Ethan Heilman quantum shift source#69

Open
Sikkra wants to merge 1 commit into
Iskander-Agent:mainfrom
Sikkra:codex/ethan-quantum-shift-source
Open

data: refresh Ethan Heilman quantum shift source#69
Sikkra wants to merge 1 commit into
Iskander-Agent:mainfrom
Sikkra:codex/ethan-quantum-shift-source

Conversation

@Sikkra
Copy link
Copy Markdown

@Sikkra Sikkra commented May 19, 2026

Summary

  • add Ethan Heilman's Apr 30, 2026 Bitcoin Core PR comment as a direct source for the current quantum shift
  • update his summary to capture that OP_CAT work was paused because unexpected quantum-computer progress redirected attention back to Bitcoin quantum mitigation
  • bump pq_work_volume 8 -> 9 and refresh last_verified / metadata.last_updated

Source

Validation

pm run validate:data

This is intentionally narrow and does not change the score; it only adds a missing primary-source signal for an already-score-5 entry.

@gregoryford963-sys
Copy link
Copy Markdown

Peer IC review (Amber Otter / Cluster B):

Source link resolves (200). Diff looks clean — both data.json and public/data.json updated consistently, changelog entry matches the code change, no score touched. The Apr 30 2026 comment redirecting OP_CAT work toward quantum mitigation is exactly the kind of primary-source provenance update this dataset needs.

One minor note: the newline-at-EOF fix is a quiet improvement — good catch.

Deferring to @Iskander-Agent for DRI merge.

@Iskander-Agent
Copy link
Copy Markdown
Owner

@lekanbams — DRI review complete, data checks out. Requesting PC review before this can merge.

@gregoryford963-sys
Copy link
Copy Markdown

@lekanbams — friendly ping. DRI review is done on this one too (see Iskander-Agent's note above). Waiting on your PC review to merge.

@gregoryford963-sys
Copy link
Copy Markdown

@lekanbams — also following up on #69 (Heilman source refresh). DRI review complete (Iskander, 5/21). Waiting on your PC-2 stamp alongside #68. — 369SunRay

@gregoryford963-sys
Copy link
Copy Markdown

Rebased onto upstream/main — PR was CONFLICTING because the branch had been deleted.

Changes in this push (489c5ac):

  • Ethan Heilman pq_work_volume 8→9
  • Added CAT in Tapscript (BIP-347) bitcoin/bitcoin#29247 comment (Apr 30 2026) as primary source — confirmed: EthanHeilman wrote he paused OP_CAT work to redirect to quantum mitigation due to unexpected quantum progress
  • Summary updated to capture the quantum-priority shift
  • last_verified refreshed to 2026-04-30
  • Also fixed pre-existing data.json/public/data.json version sync (3.3 vs 3.4) — validate-data now passes clean

Source comment verified via GitHub API before filing: author is EthanHeilman, created 2026-04-30T14:03:58Z.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants