Sub of Epic #330. `documents/audits/AUDIT_VOICE_STACK.md` Phase V5 (size M). Fast-follow, tied to migration. **Scope:** the voice orb into the migrated SPA. - Move the React + ogl voice orb into the frontend-migration #25 stack (it is lifted verbatim per the migration plan), wired to the hardened voice loop from V1/V2. **Deliverable:** the voice orb lives in the #25 SPA, driving the fixed voice loop.
Sub of Epic #330.
documents/audits/AUDIT_VOICE_STACK.mdPhase V5 (size M). Fast-follow, tied to migration.Scope: the voice orb into the migrated SPA.
Deliverable: the voice orb lives in the #25 SPA, driving the fixed voice loop.