Skip to content

[Polish] Sprint 2a — deferred minor findings #224

Description

@Lionhunt3r

Tracking issue for the 5 minor findings deferred from Sprint 2a (Repository-Bypass-Refactor, Existing Repos).

Full list with file refs and fix proposals:
docs/superpowers/polish-backlog.md — section 'Sprint 2a'.

Findings P-2a-1 through P-2a-5.

  • P-2a-1: getChildrenForParent doc-comment precision (5min)
  • P-2a-2: pending semantics inconsistency between getChildrenForParent and getPlayersByParentId (1h)
  • P-2a-3: recalculatePercentage fire-and-forget — pre-existing (15min)
  • P-2a-4: Realtime cleanup in dispose() — auto-fixed by Sprint 2c
  • P-2a-5: test-comment-mismatch (2min)

Approach: pick up opportunistically when touching the relevant files, or batch-fix in Sprint 13 (Long Tail).

Metadata

Metadata

Assignees

No one assigned

    Labels

    migration-backlogItem from Ionic→Flutter migration backlogpolishPolish/cleanup, deferred from a sprintpriority: lowLow priority

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions